- 1、本文档共30页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 电力系统动化技术介绍.doc
- 电力线上技术.doc
- 电力系统止无功补偿技术的现状及发展.doc
- 电力线载通信技术在用电信息采集系统中的应用【 】.doc
- 电力自动名词解析.doc
- 电力行业行业务开发研究.doc
- 电力通信业专业词汇汇总.doc
- 电力系统电保护.doc
- 电力行业准清单.doc
- 电动汽车新动态.doc
- 四川省广安市广安区等3地2024-2025学年高一下学期7月期末英语试题含答案.pdf
- 四川省广安市广安区等3地2024-2025学年高一下学期7月期末统测日语试卷含答案.pdf
- 2025高考数学专项三角函数的概念与诱导公式含答案.pdf
- N银行X分行个人经营性贷款业务营销策略优化研究.pdf
- Neumann边界条件作用下的自然对流换热特性离散统一气体动理学研究.pdf
- 绿色金融发展水平对城市碳排放的影响机制--基于289个城市面板数据的实证分析结果.pdf
- 服务对象政府购买建筑工程安全服务满意度影响因素分析--以Q市为例.pdf
- 新时代中国特色新型城镇化道路研究.pdf
- 税务机关防范虚开增值税发票风险管理研究--以S市为例.pdf
- 政府财政补贴对文娱上市公司企业绩效影响的实证分析.pdf
文档评论(0)