- 1、本文档共10页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 10
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 电力线载通信技术在用电信息采集系统中的应用【 】.doc
- 电力自动名词解析.doc
- 电力行业行业务开发研究.doc
- 电力通信业专业词汇汇总.doc
- 电力系统电保护.doc
- 电力行业准清单.doc
- 电动汽车新动态.doc
- 电力线数通信设备的设计.docx
- 电动车经商如何突破发展瓶颈.doc
- 电动车营策划方案.doc
- Unit6ShoppingPartALet'slearn(课件)-人教PEP版(2012)英语四年级下.pptx
- 人教版高一化学必修二课件1.2.1元素周期律第1课时原子核外电子排布.ppt
- 高三数学(理)二轮复习专题集训专题六解析几何6.3.doc
- 标记导体Ver Sunrise Moon 脚本大合集 2018版 Lookae Scripts ReadMe300.pdf
- 西宽5x19-第十九部分讨论重点.pdf
- 酒驾驾驶员模拟驾驶课程 POV-24.pdf
- 2025年江苏省苏州市八校高考历史第三次适应性试卷-普通用卷.docx
- 北京市大兴区精华学校2024-2025学年高三下学期三模历史试题.pdf
- 【语文】北京市海淀区2025届高三下学期期中考试试题(解析版).pdf
- 2025届河南省漯河市高考模拟检测语文试卷.docx
文档评论(0)