- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
省教育学教师教育分会《关于举办“教育创新在路上”赛事活动的函》
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 皮肤病常中草药介绍.doc
- 皮革防霉的研究综述.doc
- 皮革行业用词汇.doc
- 益生菌≠生元 正确服菌有助养生.doc
- 盐业营销员实战.doc
- 皮鞋油盒塑料模具设计说明书.doc
- 盐城公交C卡收费系统技术方案.doc
- 监控录像统建议方案.doc
- 盐酸标准液的标定.doc
- 监理必要和可行性.doc
- 2025年贵州六盘水中考数学试题及答案.pdf
- 2025年上海市商业公寓亲子互动儿童职业体验馆可行性研究报告.docx
- 2025年上海市地铁站口杂粮馒头迷你自动售卖机投放可行性研究报告.docx
- 2025年上海市芦苇饮料融入地方特色文化IP包装设计可行性研究报告.docx
- 2025年工业设备故障诊断与故障树分析报告.docx
- 2025年天津市历史文化街区道路用地保护与利用可行性研究报告(1).docx
- 2025年工业设备故障诊断与故障诊断技术实施效果评估指南报告.docx
- 2025年工业设备故障诊断与故障预测模型报告.docx
- 2025年贵州黔东南中考数学试题及答案.pdf
- 2025年贵州黔南中考数学试题及答案.pdf
文档评论(0)