- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
箱式无负供水设备标准
长沙多级泵厂家宏力泵业整理
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 第讲技术新理论与实践.doc
- 简支梁纸模型.doc
- 简谈城市道生态治理.doc
- 算法与数结构 单链表的创建.doc
- 简述色谱础理论中的塔板理论和速率理论.docx
- 管材的有实用知识.doc
- 管线清淤案.doc
- 第六届中精算会参会观感.doc
- 管材管件本知识.doc
- 第二次修 铁路青岛北客站安置区项目.doc
- 医疗器械使用签订协议.doc
- 2023年陕西省榆林市绥德县白家硷乡招聘社区工作者真题及参考答案详解一套.docx
- 国庆节的记忆作文800字通用10篇.docx
- 2023年陕西省榆林市绥德县满堂川乡招聘社区工作者真题带答案详解.docx
- 项目管理中的团队文化建设与沟通氛围培育.docx
- 健康产业市场调研报告.doc
- 虚拟形象的文化表达与青少年身份认同形成的互动机制.docx
- 2023年陕西省榆林市绥德县石家湾镇招聘社区工作者真题及完整答案详解1套.docx
- 2023年陕西省榆林市绥德县辛店乡招聘社区工作者真题带答案详解.docx
- 2025至2030质量检验检测行业市场发展现状及发展前景与投资报告.docx
最近下载
- 统编版六年级语文上册习作《多彩的活动》精品课件(共84张PPT).pptx VIP
- 电厂2×600MW机组扩建工程建筑及安装工程土建专业主要技术施工方案.docx VIP
- 电厂2×600MW扩建(脱硫土建、安装)工程土建专业主要施工技术方案.docx VIP
- 电厂2×600MW机组扩建工程建筑及安装锅炉专业施工技术方案.docx VIP
- 煤电公司2×600MW机组工程汽机专业主要施工技术方案.pdf VIP
- 2X660MW超超临界燃煤机组工程qtz2500型塔式起重机安装的施工方案.doc VIP
- 2X660MW超超临界燃煤机组工程#2锅炉平台楼梯安装方案全案(终版).doc VIP
- 2X660MW超超临界燃煤机组工程#2锅炉平台楼梯安装的方案.doc VIP
- 电厂(2×660MW超超临界机组)机组安装工程锅炉专业施工方案.docx VIP
- 电厂(2×660MW超超临界机组)机组安装工程汽机专业施工方案.docx VIP
文档评论(0)