- 1、本文档共35页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
网络技术应用基础知识
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 给学生的划案.doc
- 继续教育修答案.doc
- 综合布线统梗概.doc
- 综合大楼目监理大纲.doc
- 统计学原期末辅导.doc
- 综合必复知识点归纳.docx
- 细节在设风格转换中的表现分析.doc
- 综合布线语和符号.doc
- 综合开拓销手册.doc
- 综合服务心设计说明正本.doc
- 2023年陕西省商洛市柞水县两河乡招聘社区工作者真题参考答案详解.docx
- 2023年陕西省延安市宝塔区青化砭镇招聘社区工作者真题参考答案详解.docx
- 2023年陕西省汉中市西乡县罗镇乡招聘社区工作者真题及参考答案详解.docx
- 2023年陕西省延安市洛川县永乡招聘社区工作者真题及答案详解1套.docx
- 2023年陕西省商洛市商州区三岔河乡招聘社区工作者真题及参考答案详解一套.docx
- 2023年陕西省宝鸡市陇县八渡镇招聘社区工作者真题及参考答案详解一套.docx
- 2023年陕西省延安市洛川县石泉乡招聘社区工作者真题及参考答案详解一套.docx
- 2023年陕西省商洛市商州区沙河子镇招聘社区工作者真题附答案详解.docx
- 2023年陕西省咸阳市礼泉县赵镇招聘社区工作者真题及参考答案详解1套.docx
- 2023年陕西省商洛市丹凤县留仙坪乡招聘社区工作者真题及参考答案详解一套.docx
文档评论(0)