- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
肌肉放松练方法
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 美剧必备文词汇.doc
- 美加净复之路举步维艰.doc
- 网络教育组织行为学》答案.doc
- 美国FC认证介绍.docx
- 罩壳说明样板.doc
- 美国中国研究的范式转变与中国史研究的现实处境.doc
- 网络学院高绩效团队.doc
- 美国富答基金业务简介及创新构想.doc
- 网上申请家励志奖学金助学金 操作过程.doc
- 美国房子型与房产税.doc
- 2025中远海运发展股份有限公司招聘1人笔试参考题库附带答案详解.docx
- 2025山东德州市齐河县县属国有企业第一次招聘13人笔试参考题库附带答案详解.docx
- [福建]2025年福安市人力资源和社会保障局事业单位招聘168人笔试历年参考题库附带答案详解.pdf
- [西双版纳]2024年第三次云南西双版纳景洪市人民法院招聘编外人员笔试历年参考题库附带答案详解.pdf
- [长沙]2024年湖南长沙市望城区数据局招聘笔试历年参考题库附带答案详解.pdf
- [长治]2024年山西长治市潞州区引进优秀人才及事业单位招聘113人笔试历年参考题库附带答案详解.pdf
- [黄冈]2024年湖北黄冈市团风县事业单位招聘50人笔试历年参考题库附带答案详解.pdf
- [珠海]2024年广东珠海市机关事务管理局招聘合同制职员4人笔试历年参考题库附带答案详解.pdf
- [青岛]山东青岛市即墨区教育和体育局选聘2025届国家公费师范生20人笔试历年参考题库附带答案详解.pdf
- [秦皇岛]2024年河北卢龙经济开发区管理委员会选聘事业单位工作人员5人笔试历年参考题库附带答案详解.pdf
文档评论(0)