- 1、本文档共5页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
胸部肌肉习方法
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 老人健康务行业分析.doc
- 美提名十个性摩天楼 国内四塔入选大众机械.doc
- 翻译常用语汇编.doc
- 翠园环境观设计理念与创意.doc
- 美食节活方案.docx
- 老爷岭数网技术协议.doc
- 老司机的驶经验.docx
- 继续教育员操作手册.doc
- 美术馆专之一.doc
- 老百姓开预算.doc
- 2025年企业知识管理平台内容生态构建与知识管理创新实践研究报告.docx
- 2025年二手奢侈品电商平台用户界面优化与用户行为研究.docx
- 2025年数据中心绿色运维与数据中心运维效率提升策略.docx
- 乡村民宿数字化运营市场前景与挑战分析.docx
- 2025新能源汽车产业链绿色金融政策支持体系构建与优化.docx
- 2025年职业技能培训平台跨行业合作与资源共享案例研究.docx
- 2025年数据中心绿色运维与数据中心运维绿色环保报告.docx
- 2025年脑机接口医保支付政策对医疗设备行业市场布局影响报告.docx
- 2025年社区维修服务智能化升级,产业链上下游协同发展分析.docx
- 储能技术成本效益分析模型在储能设备性能优化中的应用报告.docx
文档评论(0)