- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
脊髓肿瘤治指南
HYPERLINK / /
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by ser
您可能关注的文档
- 翠园环境观设计理念与创意.doc
- 美食节活方案.docx
- 老爷岭数网技术协议.doc
- 老司机的驶经验.docx
- 继续教育员操作手册.doc
- 美术馆专之一.doc
- 老百姓开预算.doc
- 联想组织构分析.docx
- 联想液晶修手册.doc
- 联想:品国际化公关案例[精].doc
- 2025年数字藏品投资市场风险防范与投资建议.docx
- 商业火箭回收技术2025年市场风险与应对策略.docx
- 户外装备租赁行业法律法规与政策解读报告.docx
- 2025年,线上法律咨询服务平台盈利模式的挑战与机遇.docx
- 智慧农业数据共享平台建设:农业信息化与农村金融服务报告.docx
- 2025年城市垃圾分类监管技术智能识别系统市场分析报告.docx
- 2025年跨境电商直播电商基地直播电商行业竞争格局与市场策略研究报告.docx
- 2025年储能行业政策支持体系深度分析报告.docx
- 海洋碳汇技术标准制定与实施策略研究报告.docx
- 数字藏品市场合规发展中的区块链技术安全与合规报告.docx
最近下载
- 2024年G1工业锅炉司炉考试题库附答案.docx VIP
- 《初中诗词鉴赏》课件.ppt VIP
- 北师大版九年级数学上册《菱形的性质与判定》第2课时示范公开课教学设计.docx VIP
- 2024年湖北省武汉市江岸区后湖街道招聘社区工作者真题含答案详解.docx VIP
- 动火安全作业票填写模板(2022版).doc VIP
- 制造业智能制造执行系统(MES开发方案.doc VIP
- 2024年湖北省武汉市江岸区一元街道招聘社区工作者真题含答案详解.docx VIP
- 2025年度全国乡村医生考试复习题库含答案【推荐】.docx VIP
- 锚杆支护工理论考试题库500题(含答案).docx VIP
- NY_T 1966—2010 温室覆盖材料安装与验收规范 塑料薄膜.doc VIP
文档评论(0)