- 1、本文档共7页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
英文简历用词汇学校词汇信件写作
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 自治区文单位测评体系.doc
- 自游天下散产品.doc
- 自然科学金申请书模板.doc
- 自然灾害化防护应急流程.doc
- 自然辨证复习总结答案.doc
- 自然科学金申请书撰写注意事项.doc
- 耐磨铸铁处理.doc
- 自力更生享受!DIY家庭多媒体影音中心.doc
- 自动售货PLC设计毕业论文.doc
- 自动化煎机的机械系统设计.doc
- 2025陕西咸阳乾县招聘社区专职工作人员36人备考题库及答案解析.docx
- 2025山东智慧谷实验幼儿园招聘1人备考题库及答案解析.docx
- 2025山西河津农商银行第五期暑期大学生社会实践招募备考题库及答案解析.docx
- 2025陕煤电力集团有限公司招聘4人备考题库及答案解析.docx
- 2025山西药科职业学院招聘博士研究生4人备考题库及答案解析.docx
- 2025上海市教师教育学院(上海市教育委员会教学研究室)公开招聘博士研究人员备考题库及答案解析.docx
- 2025陕西省疾病预防控制中心招聘9人备考题库及答案解析.docx
- 2025上海市军队离休退休干部活动中心招聘1人备考题库及答案解析.docx
- 2025陕西延安市志丹县人民政府办公室大学生到政府机关见习工作60人备考题库及答案解析.docx
- 2023年陕西省延安市吴起县周湾镇招聘社区工作者真题及完整答案详解1套.docx
文档评论(0)