- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
营改增政解读
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 苏宁电器期偿债能力分析.doc
- 苏卡达饲秘笈.doc
- 苏州产业构的未来导向.doc
- 苏家屯歌大赛海选策划.docx
- 苏打标准报版本.doc
- 苏教版思品德八级下册《消费者的权益》教案.doc
- 色谱分析离方法概述.doc
- 苏泊尔炊项目建议书终.doc
- 若干争议探讨.doc
- 苦杏仁甙镇痛作用和无身体依赖性研究.docx
- 4.2机织物的结构(课件)-《服装材料》同步教学(中国纺织出版社).pptx
- 5.2织物的染整(课件)-《服装材料》同步教学(中国纺织出版社).pptx
- 5.3 纤维的弯曲、扭转与压缩(课件)《纺织材料学(第2版)》同步教学(纺织出版社).pptx
- 任务1-5 几种重要的化学纤维(课件)-《服装材料》同步教学(中国纺织出版社).pptx
- 劳动版《服装材料》课件 第六章 第四节 服装垫料.pptx
- 绪论-服装材料基础与应用(中国轻工业出版社)中职同步教学课件.pptx
- 劳动版《服装材料》课件 第六章 第六节 紧扣材料.pptx
- 第1章 绪论 (课件)《纺织材料学》同步教学(中国纺织出版社).pptx
- 劳动版《服装材料》课件 第一章 第一节 服装材料的种类.pptx
- 第三章 服装面料的基本组织(课件)-《服装材料》同步教学(北京理工大学出版社).pptx
文档评论(0)