- 1、本文档共21页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
行政法行诉讼法复习要点
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 20
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 营业税暂条例及实施细则.doc
- 营销专业业论文.doc
- 营销EQ师手册.doc
- 营改增税增加现象分析.doc
- 营销人员质培养.doc
- 营销推广期与费用预算.doc
- 营销推广准化流程终.doc
- 营销策划世平.doc
- 营销案例析小组.doc
- 营销的十学派.doc
- 初中化学课堂中人工智能学习分析结果的可视化展示教学研究课题报告.docx
- 《便利店新零售模式中顾客体验与消费者体验设计理念与实践》教学研究课题报告.docx
- 基于虚拟现实情境创设的初中英语听说教学策略研究教学研究课题报告.docx
- 工业机器人电子制造智能控制中的机器学习与优化算法研究教学研究课题报告.docx
- 高中生物实验探究教学中的实验设计与实施策略教学研究课题报告.docx
- 校园广播在初中信息技术教学中的实践与探索教学研究课题报告.docx
- 跨校协作教学背景下国家智慧教育云平台的构建与应用研究教学研究课题报告.docx
- 高中地理数字化教学与教师教学画像构建中的参与度探讨教学研究课题报告.docx
- 高中体育运动技能评价体系构建研究教学研究课题报告.docx
- 基于物联网技术的智能家居系统智能家居设备能耗监测与节能策略教学研究课题报告.docx
文档评论(0)