- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
计算机概及网络基础知识
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 解表类中药分类及应用.doc
- 解析茅台粮液营销盲点为何没成奢侈品品牌.doc
- 解读云南旱那些缺水的日子.docx
- 视频目录载秘籍.doc
- 西餐礼仪葡萄酒礼仪.doc
- 解读新国《生活饮用水卫生标准》.doc
- 西安曲江馆惠宾苑IT解决方案.doc
- 詹从淼 标心动力.doc
- 视得安楼对讲解决方案.doc
- 解馋坊特小吃店计划书.doc
- 河北省保定市2024-2025学年学高二(下)期末语文模拟试卷【含答案】.docx
- 2025年广东省中考历史考前指导试卷(含答案).docx
- 2025年东北三省名校名师高考历史5月模拟试卷【含答案】.docx
- 北京市平谷区2024-2025学年高二(下)期末语文试卷【含答案】.docx
- 江苏省镇江市2024-2025学年高一(下)6月语文试卷-普通用卷【含答案】.docx
- 2025年山东省淄博市中考历史临考模拟卷(五)(含答案).docx
- 云南省临沧地区中学等学校2024-2025学年高二(下)期末语文试卷【含答案】.docx
- 2025年江苏省苏州市吴中区甪直中学中考历史二模试卷【含答案】.docx
- 部编版七年级下历史第三单元检测原卷【含答案】.docx
- 2025年安徽省滁州市定远县双塘中学中考历史三模试卷(含答案).docx
文档评论(0)