Module4SandstormsinAsia--Period6ExtensiveReading(CulturalCorner)学案(外研版必修3).doc

Module4SandstormsinAsia--Period6ExtensiveReading(CulturalCorner)学案(外研版必修3).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Module4SandstormsinAsia--Period6ExtensiveReading(CulturalCorner)学案(外研版必修3).doc

第  PAGE 6 页 共  NUMPAGES 6 页 Period 6 Extensive Reading(Cultural Corner) Read the passage on P39 and answer the questions. 1. How do countries in Europe try to improve the environment? 2. When did the “Green” movement begin? 3. What does the “Green” movement try to do? Ask students talk about the following two questions: a. Are there organizations in China whose aim is to protect the environment? b. What do you know about the organizations? If students don’t know any, present them some materials. Here are some supplementary reading materials on the paper. China Adopts Environment-Friendly Way to Dispose Rubbish China is adopting an environment-friendly way of rubbish disposal by building its largest rubbish-burning fueled power plant in Shanghai, according to Fridays Chinadaily. The plant to be built in Shanghais Pudong New District is designed to have the capacity to generate 100,000 megawatts of electricity annually by means of thermal energy generated through burning 365,000 tons of rubbish, the paper said. The project, expected to be completed in October 2001, will cost 670 million yuan (80.7 million U.S. dollars), including a low-interest loan of 30.17 million offered by the French government. The majority of the loan will be used to buy some key technology and equipment from HYPERLINK /english/data/france.html \t _blank  France for the new power plant, an official surnamed Tao who is responsible for the construction of the plant and the installation of the equipment was quoted as saying. The plant will keep a close eye on the discharge of waste gas and smoke and fume emissions in accordance with the emission standards set by the European Union, said the official, adding that the new plant will become a pilot project for neighboring areas of Shanghai and other big cities in terms of rubbish disposal. Shanghai now yields more than 10,000 tons of household waste every day, of which about 80 percent is buried after a f

文档评论(0)

youbika + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档