- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师公路运输模拟试题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 一级建造师工程经济考试模拟试题第二套.doc
- 一级建造师建设工程经济备考习题.doc
- 一级建造师建设工程经济多选题预测名师版AB过关必做.doc
- 一级建造师建设工程经济实战模拟试卷.doc
- 、新邵县财政信息网络培训资料.doc
- 一级建造师建设工程经济实战模拟试卷一.doc
- 一级建造师建设工程经济实战模拟试卷二.docx
- 一建建设工程经济模拟试题及答案.doc
- 一级建造师建设工程经济实战模拟试卷二中大网校.doc
- 一级建造师建设工程经济实战模拟试卷二单选题(1.doc
- 三一重工:2024年可持续发展(ESG)报告.pdf
- 绿色保险(十九)聚焦铅酸蓄电池行业上市公司环责险信息披露的破与立.pdf
- 3种公私联动打法撬动新流量机会.pdf
- 【戴德梁行】2025年全球物流与工业地产市场动态报告.docx
- 房地产市场报告 -2025年5月全国租赁市场月报.pdf
- 宏全基因组测序结题报告.pdf
- 【1628东察创新】McKinsey未来竞争的主战场解读报告.docx
- 【工业互联网产业联盟】2025年电力行业5G工厂建设实施参考指南.docx
- 半导体量检测设备二手翻新修复改造产业投融资深度分析与风险警示报告.pdf
- 中国公募基金的投资者回报差研究 202505-当幻想撞上现实.pdf
文档评论(0)