- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师商业经济专业知识与实务试题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 一级建造师建设工程经济多选题预测名师版AB过关必做.doc
- 一级建造师建设工程经济实战模拟试卷.doc
- 、新邵县财政信息网络培训资料.doc
- 一级建造师建设工程经济实战模拟试卷一.doc
- 一级建造师建设工程经济实战模拟试卷二.docx
- 一建建设工程经济模拟试题及答案.doc
- 一级建造师建设工程经济实战模拟试卷二中大网校.doc
- 一级建造师建设工程经济实战模拟试卷二单选题(1.doc
- 一级建造师建设工程经济实战模拟试卷附答案.doc
- 一级建造师建设工程经济实战模拟试卷二单选题.doc
- 城乡精神文明建设的策略优化与路径选择.docx
- 玻璃设备生产线项目初步设计.docx
- 2025年自考专业(汉语言文学)考前冲刺测试卷带答案详解(轻巧夺冠).docx
- 玻璃设备生产线项目规划设计方案(参考范文).docx
- 2025年自考专业(汉语言文学)考前冲刺测试卷带答案详解(基础题).docx
- 2025年自考专业(汉语言文学)考前冲刺测试卷含答案详解【A卷】.docx
- 2025年自考专业(汉语言文学)考前冲刺测试卷含完整答案详解(必刷).docx
- 2025年自考专业(汉语言文学)考前冲刺测试卷含答案详解【综合题】.docx
- 文学的历史脉络-从古代到现代的文学演变.pptx
- 城乡精神文明建设的多维度策略与实施.docx
文档评论(0)