- 1、本文档共8页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济基础讲义第三十一章1
HYPERLINK /环球网校经济师,刘艳霞领衔主讲,业内最高通过率辅导课程!
/leraning/class_jjs/
HYPERLINK / \t _self
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 8
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not
您可能关注的文档
- 一级建造师建设工程经济实战模拟试卷一.doc
- 一级建造师建设工程经济实战模拟试卷二.docx
- 一建建设工程经济模拟试题及答案.doc
- 一级建造师建设工程经济实战模拟试卷二中大网校.doc
- 一级建造师建设工程经济实战模拟试卷二单选题(1.doc
- 一级建造师建设工程经济实战模拟试卷附答案.doc
- 一级建造师建设工程经济实战模拟试卷二单选题.doc
- 一级建造师建设工程经济复习要点总结secret.doc
- 、企业信息登记操作手册.doc
- 一级建造师建设工程经济模拟试卷中大网校.doc
- 河北省沧州市2023-2024学年高一上学期期中考试政治(解析版).docx
- 湖南省三湘名校教育联盟2023-2024学年高一上学期11月期中联考政治(原卷版).docx
- 江苏省南京市大厂江浦文昌四校2023-2024学年高一上学期期中联考政治(原卷版).docx
- 2025年中级社工实务冲刺课要点.pdf
- 2025年中级社工法规与政策冲刺课要点.pdf
- 2025年中级综合能力冲刺课要点.pdf
- 2025年初级综合能力冲刺.pdf
- (税务局、民政局)在2025年庆祝建党104周年暨“两优一先”表彰大会上的讲话.docx
- 学习2025年《党的十八大以来深入贯彻作风建设精神的成效和经验》及《作风建设改变中国》心得体会.docx
- 2025年县委书记参加全市警示教育会议心得体会.docx
文档评论(0)