- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师考试人力资源专业知识与实务真题
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 一级建造师建设工程经济测试卷五.doc
- 一级建造师建设工程经济模拟预测试卷2.docx
- 一级建造师建设工程经济模拟预测试卷中大网校1.doc
- 一级建造师建设工程经济练习题1.doc
- 一级建造师建设工程经济考试真题1.doc
- 一级建造师建设工程经济考试.doc
- 一级建造师建设工程经济考试真题2.doc
- 一级建造师建设工程经济考试真题及答案.doc
- 一级建造师建设工程经济考试真题及答案1.doc
- 一级建造师建设工程经济考试真题及答案2.doc
- 芜湖市区中心软装方案.pdf
- 综合文学spanish liture paper西牙.pdf
- 知识讲解平面向量线性运算.pdf
- 有线双向电视业务系统.pdf
- 飞机系统冰雨水有意剩下空白a318 a319 a320 csn tf dsc.pdf
- 内容网络工作组txt.pdf
- 管线系统用户功能确认书smartpipet2查询统计.pdf
- redemittel zur diskussion演讲者进行讨论.pdf
- labview tm乐高思维风暴nxt advanced programming guide.pdf
- 课件2 x-03 p1 tablette murale tm verone平板电脑.pdf
文档评论(0)