- 1、本文档共13页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级经济师运输经济水路专业知识模拟题
ikao.mobi(爱考手机网)
ikao.mobi(爱考手机网)
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be
您可能关注的文档
- 中国行业信息化奖项评选活动策划方案.doc
- 中国经济发展和改革的总体分析下试卷分doc.doc
- 中级中级经济师工商管理学习笔记第一章.docx
- 中级会计师考试经济法.doc
- 中央财经大学西方经济学考研真题及答案讲解.doc
- 中级会计职称经济法模拟试卷及答案解析二.doc
- 中级会计经济法讲义下载.doc
- 中级会计职称经济法真题.doc
- 中级会计师中级经济法全真模拟试题中大网校.doc
- 中级会计职称经济法模拟题.doc
- GB/T 45632-2025数字航空摄影测量 控制测量规范.pdf
- GB/T 45616.4-2025自动化系统与集成 面向制造的数字孪生框架 第4部分:信息交换.pdf
- 中国国家标准 GB/T 45616.4-2025自动化系统与集成 面向制造的数字孪生框架 第4部分:信息交换.pdf
- 《GB/T 45616.4-2025自动化系统与集成 面向制造的数字孪生框架 第4部分:信息交换》.pdf
- GB/T 33588.1-2025雷电防护系统部件(LPSC) 第1部分:连接件的要求.pdf
- 中国国家标准 GB/T 33588.1-2025雷电防护系统部件(LPSC) 第1部分:连接件的要求.pdf
- 《GB/T 33588.1-2025雷电防护系统部件(LPSC) 第1部分:连接件的要求》.pdf
- 《GB/T 33588.3-2025雷电防护系统部件(LPSC) 第3部分:隔离放电间隙(ISGs)的要求》.pdf
- 中国国家标准 GB/T 33588.3-2025雷电防护系统部件(LPSC) 第3部分:隔离放电间隙(ISGs)的要求.pdf
- GB/T 18757-2025企业建模与体系结构 企业参考体系结构与方法论的要求.pdf
文档评论(0)