- 1、本文档共25页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国会计专业技术资格考试经济法模拟试卷二
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- 中级经济师考试工商管理专业知识与实务真题中大网校5.doc
- 中级经济师考试工商管理专业知识与实务真题中大网校6.doc
- 中级经济师考试工商管理专业知识与实务真题中大网校2.doc
- 中级经济师考试工商管理专业知识与实务真题中大网校4.doc
- 中级经济师考试工商管理专业知识与实务真题中大网校7.doc
- 中级经济师考试工商管理专业知识与实务精准试题.doc
- 中级经济师考试工商管理专业知识与实务精准试题1.doc
- 中级经济师考试工商管理专业知识与实务真题中大网校.doc
- 中级经济师考试工商管理历试题及答案.doc
- 中级经济师考试工商管理真题及答案.doc
- 2024-2025学年四川省绵阳南山中学高二下学期5月月考历史试题.doc
- 2024-2025学年四川省苍溪中学校高二下学期第二学段考试历史试题.doc
- 2024-2025学年四川省资阳中学高二下学期6月测试历史试题.doc
- 2024-2025学年四川省资阳中学高二下学期期中检测历史试题.doc
- 2024-2025学年四川省部分学校高二下学期5月月考历史试题.doc
- 我学会了-作文400字10篇.doc
- 2024-2025学年天津市第二中学高一下学期第二次月考(合格考)历史试题.doc
- 2024-2025学年天津市第五中学高二下学期五月月考历史试题.doc
- 2024-2025学年天津市第五十七中学高一下学期第二次月考历史试题.doc
- 2024-2025学年天津市河西区高一下学期期中质量调查历史试题.doc
文档评论(0)