- 1、本文档共45页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国硕士研究生入学考试英语核心词汇必备商志词汇增加单元对应信息复制
考研英语背词班内部资料ShineKY09-04 传奇考研英语名师 商志 2009年2月最新修订
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings alongPAGE 46
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral ra
您可能关注的文档
- 中级经济师考试工商管理历试题及答案.doc
- 中级经济师考试工商管理真题及答案.doc
- 中级经济师考试工商管理试题及答案私人整理打印版.doc
- 中级经济师考试工商管理专业知识与实务重点难点联系试题.doc
- 中级经济师考试工商管理专业第一章模拟试卷及答案.doc
- 中级经济师考试工商管理专业知识与实务考前突破卷.doc
- 中级经济基础讲义第十三章(1.doc
- 中级经济师考试房地产专业真题及解析.docx
- 中级经济师考试建筑经济专业知识与实务提分卷.doc
- 中级经济师考试建筑经济专业知识与实务最新预测试卷.doc
- 2025年中国锻铁围栏市场调查研究报告.docx
- 2025年中国椭圆型市场调查研究报告.docx
- 2025年中国无蔗糖原味豆浆市场调查研究报告.docx
- 2025-2031年中国泛在电力物联网行业发展运行现状及投资潜力预测报告.docx
- 2025年中国制袋机零件市场调查研究报告.docx
- 2025年中国智能除垢型电子水处理仪市场调查研究报告.docx
- 2025-2031年中国甘肃省乡村旅游行业市场深度研究及投资策略研究报告.docx
- 2025-2031年中国干海产品行业市场发展监测及投资战略规划报告.docx
- 2025年中国全铝图解易拉盖市场调查研究报告.docx
- 2025年中国人造毛皮服装市场调查研究报告.docx
文档评论(0)