- 1、本文档共9页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全国经济专业技术资格考试试卷金融专业知识与实务初级
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should bePAGE 126
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casin
您可能关注的文档
- 中级经济基础讲义第十三章(1.doc
- 中级经济师考试房地产专业真题及解析.docx
- 中级经济师考试建筑经济专业知识与实务提分卷.doc
- 中级经济师考试建筑经济专业知识与实务最新预测试卷.doc
- 中级经济师考试房地产经济专业知识与实务成功过关试题.doc
- 中级经济师考试建筑经济专业知识与实务考前突破卷.doc
- 中级经济师考试工商管理专业实务预测试题中大网校1.doc
- 中级经济师考试工商管理专业知识与实务重点难点练习试题.doc
- 中级经济师考试教材财政税收讲义:中央银行与货币政策.doc
- 中级经济师考试房地产经济专业知识与实务高频考点试题题.doc
- 2024-2025学年冶金工业技能鉴定试题预测试卷(夺冠系列)附答案详解.docx
- 2024-2025学年冶金工业技能鉴定通关题库一套附答案详解.docx
- 2024-2025学年冶金工业技能鉴定通关考试题库附答案详解(综合题).docx
- 2024-2025学年冶金工业技能鉴定预测复习及参考答案详解【夺分金卷】.docx
- 2024-2025学年冶金工业技能鉴定检测卷及完整答案详解(精选题).docx
- 2025《壶口瀑布》《太空一日》语文教学镜头.docx
- 2024-2025学年冶金工业技能鉴定每日一练试卷附参考答案详解【综合卷】.docx
- 中医康复技术专业教学标准(高等职业教育专科)2025修订.docx
- 2024-2025学年冶金工业技能鉴定每日一练试卷及参考答案详解【培优A卷】.docx
- 2024-2025学年冶金工业技能鉴定考前冲刺练习题附完整答案详解(易错题).docx
文档评论(0)