- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法基础全真机考模拟试题中大网校
中大网校引领成功职业人生
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre st
您可能关注的文档
- 中级经济师金融专业与务实备考单选练习.doc
- 二级建造工程师考试网上辅导建设工程施工管理施工信息管理.doc
- 云南初中信息技术五大模块复习资料:总结计划汇报设计可编辑.doc
- 云南农业大学学报社科版论文模板.doc
- 中级职称中级经济法试题及详解.doc
- 产业经济学必修教学大纲戴.doc
- 人事厅培训项目投资估算和经济效益讲课稿.doc
- 代的美国经济.doc
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- DB32∕T 2202-2012 北美鹅掌楸容器苗生产技术规程.docx
- DB32_T 2942-2016鲜食夏大豆 通豆9号品种.docx
- DB3210_T 1142-2023 扬州豆腐菜肴制作技艺.docx
- 鸟类追踪器使用规范_DB23T 2871-2021.docx
- DB33/T 2548-2022朱鹮人工种群构建及野化训练技术规程.docx
- DB3308T 153-2024柑橘园碳排放核算办法.docx
- DB3305_T 107-2019 营养健康村建设规范.docx
- DB3305╱T 112-2019 乡镇现代商贸建设和评价规范.docx
- DB3301 T 0393-2023 放心消费直播间管理规范.docx
- DB22T 2349-2015 无公害农产品 寒酥梨生产技术规程.docx
最近下载
- 铁塔室外光电一体箱(技术规范书)-.docx VIP
- 铂科磁材在太阳能逆变器的应用.pdf VIP
- 2025·上海浦东新区·二模智慧藏于“笨办法”:慢工出细活的真谛+审题立意及范文-备战2025年中考语文各地名校模考卷作文导写.docx VIP
- 经血源传播疾病的医院预防控制措施.docx VIP
- 安全操作规程(全套).doc VIP
- (word完整版)苏州工业园区合格证第四版参考题库答案.pdf VIP
- 2025年北京市通州区中考一模从“乐在其中”悟人生真谛”审题立意及范文-备战2025年中考语文各地名校模考卷作文导写.docx VIP
- 2021版 客户侧电能计量装置通用设计要求 第1部分 10kV用电客户电能计量装置.docx VIP
- Q∕SYCQ 4008-2022 工业用液化轻烃原料(打印版).pdf VIP
- 租房合同范本(完美打印版)6篇 .pdf VIP
文档评论(0)