- 1、本文档共22页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法基础真题2
学会计,考会计到鸭题库YaTiK每天免费直播上课,更多押题资料下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre s
您可能关注的文档
- 云南初中信息技术五大模块复习资料:总结计划汇报设计可编辑.doc
- 云南农业大学学报社科版论文模板.doc
- 中级职称中级经济法试题及详解.doc
- 产业经济学必修教学大纲戴.doc
- 人事厅培训项目投资估算和经济效益讲课稿.doc
- 代的美国经济.doc
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- 份服装行业经济运行概述.doc
- 企业信息管理师复习资料最后定稿.doc
- 2025年休闲食品健康化转型下的市场拓展策略与渠道创新报告[001].docx
- 农村电商服务站品牌建设:2025年运营模式创新与品牌传播报告.docx
- 2025年互联网金融平台合规整改与金融科技监管的合规监督与可持续发展策略.docx
- 2025年短视频平台内容监管与平台社会责任关系研究报告.docx
- 农产品溯源体系在农产品质量安全监管中的信用体系构建与实施策略研究.docx
- 2025年工业互联网平台数据备份与恢复策略创新方案探讨.docx
- 2025年线上法律咨询服务平台法律咨询行业竞争策略研究.docx
- 农业产业集群农产品流通体系构建与发展机制报告.docx
- 智能制造领航者:2025年3D打印技术在规模生产中的应用效果分析报告[001].docx
- 农村金融服务创新与农村金融消费者权益保护法规实施效果分析报告.docx
文档评论(0)