- 1、本文档共14页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法基础最新试题中大网校
中大网校引领成功职业人生
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre st
您可能关注的文档
- 中级职称中级经济法试题及详解.doc
- 产业经济学必修教学大纲戴.doc
- 人事厅培训项目投资估算和经济效益讲课稿.doc
- 代的美国经济.doc
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- 份服装行业经济运行概述.doc
- 企业信息管理师复习资料最后定稿.doc
- 企业信息管理期末复习重点专科.doc
- 企业会计信息化工作规范部分答案.doc
- DB23_T 3698-2024悲伤辅导服务规范.docx
- DB32╱T 4022-2021 海外园区规划编制规程.docx
- DB32/T 4419-2022 公路服务区智慧节水技术规范.docx
- DB3212 T 1125 -2023碳排放在线监测系统建设规范.docx
- 烘焙食品诚信计量行为指南 DB3206 T 1066-2024.docx
- DB22T2433-2016 大豆食心虫性诱剂使用技术规程.docx
- DB22T 2263-2015 大豆抗灰斑病鉴定技术规程.docx
- DB22T1715-2012 方向盘转向力及转向角检测仪通用技术条件.docx
- DB22T 1773-2013 绿色食品 日光温室冬春茬茄子生产技术规程.docx
- DB32T3207-2017 甘薯 徐紫薯3号生产技术规程.docx
文档评论(0)