- 1、本文档共11页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称经济法真题
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 代的美国经济.doc
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- 份服装行业经济运行概述.doc
- 企业信息管理师复习资料最后定稿.doc
- 企业信息管理期末复习重点专科.doc
- 企业会计信息化工作规范部分答案.doc
- 企业信息管理形成性考核册答案本科.doc
- 份莫遥汽车营销信息简报DOCP.doc
- 企业信息管理形成性考核册完整版.doc
- DB22_T2381-2015_中华绒螯蟹盐碱沼泽生态养殖技术规范_吉林省.docx
- DB22_T2153-2014_草型湖泊河蟹生态养殖技术规程_吉林省.docx
- DB22_T2262-2015_绿化树木移植技术规程_吉林省.docx
- DB22_T1856-2013_卷烟生产企业单位产品综合电耗限额_吉林省.docx
- DB22_T2355-2015_薄皮甜瓜品种吉丰花冠_吉林省.docx
- DB22_T2406-2015_糖尿病前期的管理规范_吉林省.docx
- DB22_T2147-2014_油用型向日葵杂交种种子质量_吉林省.docx
- DB22_T2196-2014_血液透析用水及血液透析液质量监控规范_吉林省.docx
- DB22_T2036-2014_泥炭的应用分类_吉林省.docx
- DB22_T2201-2014_社区卫生机构首诊服务规范_吉林省.docx
最近下载
- 检验医学室内质控图模板.xls VIP
- 酒店工程部服务意识培训.ppt
- 2014款雷克萨斯CT200h_汽车使用手册用户操作图示驾驶指南车主车辆说明书电子版.pdf
- SMED快速换模完整.doc VIP
- 《婴幼儿回应性照料》第八讲.pptx VIP
- 乳胶漆施工工艺55页课件.ppt VIP
- 最新人教版九年级数学上册-全册课件全集(1215张).pptx VIP
- 2025至2030中国村镇银行行业深度分析及发展前景与发展战略报告.docx
- JTG D 20-2017公路路线设计规范_(高清版).pdf VIP
- 道奇-JCUV-产品使用说明书-Journey Crossroad 旅行版(2.4L)-JCUV (B6F)-2013款酷威用户手册(产品使用说明书).pdf VIP
文档评论(0)