- 1、本文档共23页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级会计职称考试初级经济法模拟题三
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 份信息参考.doc
- 任宜东文化用品库存管理信息系统文档需求分析说明书.doc
- 份服装行业经济运行概述.doc
- 企业信息管理师复习资料最后定稿.doc
- 企业信息管理期末复习重点专科.doc
- 企业会计信息化工作规范部分答案.doc
- 企业信息管理形成性考核册答案本科.doc
- 份莫遥汽车营销信息简报DOCP.doc
- 企业信息管理形成性考核册完整版.doc
- 企业所得税汇算清缴与地方税费结算纳税人信息修改、维护业务流程及规则正稿.doc
- 人教版八年级上册数学精品教学课件 第十三章 三角形 章末整合练.ppt
- 人教版八年级上册数学精品教学课件 第十五章 轴对称 15.3 等腰三角形-15.3.1 等腰三角形-第2课时 等腰三角形的判定 (4).ppt
- 人教版八年级上册数学精品教学课件 极速提分法 第17招 整体思想在解题中的七种技巧.ppt
- 人教版八年级上册数学精品教学课件 第十五章 分式 专项突破9 分式方程的解在求字母的值或取值范围中的常用技巧.ppt
- 人教版八年级上册数学精品教学课件 第十八章 分式 18.3 分式的加法与减法-第1课时 分式的加减.ppt
- 人教版八年级上册数学精品教学课件 第十四章 全等三角形 14.1 全等三角形及其性质 (4).ppt
- 七年级作文成长的经历(11篇).docx
- 法律责任豁免声明及工作证明函(6篇).docx
- 叙事作文那是一次难忘的尝试750字通用14篇.docx
- 沙滩里的秘密500字(14篇).docx
文档评论(0)