- 1、本文档共4页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
初级建筑经济师专业知识与实务大纲
HYPERLINK 正保远程教育(美国纽交所上市公司 代码:DL)
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. shaft coupling .1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be l
您可能关注的文档
- 会计从业会计基础第十章主要经济业务事项账务处理.doc
- 会计专业技术资格考试经济法基础全真模拟题五.doc
- 会计考试经济法基础应试指南模拟题部分+1.docx
- 企业安全生产标准化信息管理系统用户操作手册企业端.doc
- 会计信息失真治理论文审计监督论文会计内部控制毕业论文略论会计信息失真的治理对策.doc
- 会计信息系统至章.doc
- 会计考试经济法基础应试指南模拟题部分.docx
- 会计职称中级经济法历真题精选第章.docx
- 会计师考试大纲经济法.doc
- 会计职称初级经济法基础章节测试题.doc
- 2025年保密知识考试教育考试题(含答案).docx
- 2025年军队文职招录笔试《英语语言文学》备考模拟题及答案.docx
- 军队文职人员招聘之军队文职法学考试题附答案.docx
- 【2025年】吉林省吉林市公务员省考公共基础知识预测试题(含答案).docx
- 2025年安徽省合肥市辅警协警笔试笔试预测试题(含答案).docx
- 2025年公安局分局警务辅助人员招聘考试笔试试题(附答案) .docx
- 事业单位综合基础知识题考试题及答案.docx
- 2025年辽宁省营口市国家公务员公共基础知识预测试题含答案.docx
- 2025年陕西省渭南市特种作业煤矿安全作业煤矿采煤机掘进机操作作业真题含答案.docx
- 2025年凉山彝族自治州冕宁县食品药品监督管理局招聘试题(附答案).docx
文档评论(0)