- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
蒋学模政治经济学教材第版笔记第章平均利润、利息与地租
Born to win
经济学考研交流群 点击加入
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/
您可能关注的文档
- 经济师中级工商管理专业知识与实务试题及答案1.doc
- 经济师中级商业专业知识与实务试题及答案3.doc
- 经济师中级工商管理专业知识与实务试题及答案2.doc
- 经济师中级工商管理真题及详解.doc
- 经济师中级工商管理真题及答案打印版.doc
- 经济师中级工商管理预测题.doc
- 经济师中级工商管理重点讲义:第章.doc
- 经济师中级经济基础习题班模拟试卷.doc
- 第章落基山运动用品商店及其战略信息系统计划.doc
- 经济师中级人力资源专业知识与实务试题及答案2.doc
- GB/T 22120-2025企业信用数据项要求.pdf
- GB/T 45988-2025数字化转型管理 能力体系建设要求.pdf
- GB/T 45957-2025信息技术 政务服务码 码系统接口要求.pdf
- 中国国家标准 GB/T 45957-2025信息技术 政务服务码 码系统接口要求.pdf
- 《GB/T 45957-2025信息技术 政务服务码 码系统接口要求》.pdf
- GB/T 755-2025旋转电机 定额与性能.pdf
- 《GB/T 755-2025旋转电机 定额与性能》.pdf
- 中国国家标准 GB/T 755-2025旋转电机 定额与性能.pdf
- GB/T 31722-2025网络安全技术 信息安全风险管理指导.pdf
- 《GB/T 31722-2025网络安全技术 信息安全风险管理指导》.pdf
最近下载
- 2024-2025学年四川省德阳市高中高三(上)第一次诊断考试物理试卷(含解析).docx VIP
- 2023年安庆市迎江区长风乡招聘村后备干部考试真题及答案.pdf VIP
- 2020年北京市第二次普通高中学业水平合格性考试数学试卷(含答案).docx VIP
- 行政管理总监绩效考核.pptx VIP
- 道德与法治一年级上册统编版4平平安安回家来课件.pptx VIP
- DLT1555-2016 六氟化硫气体泄漏在线监测报警装置运行维护导则.docx VIP
- (高清版)B-T 18910.61-2021 液晶显示器件 第6-1部分:液晶显示器件测试方法 光电参数.pdf VIP
- 安全风险管控档案1.doc VIP
- GB∕T 3183-2017 砌筑水泥.pdf
- 思泰克spi锡膏检测仪操作手册.pdf VIP
文档评论(0)