- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中级会计师考试真题及答案汇总下载
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2.
您可能关注的文档
- 附件:广州市工业企业安全生产标准化评定标准.doc
- 陈志猛晋江市罗山福埔华泰国际新城房地产估价报告民生.doc
- 郫县经济形势分析与展望.doc
- 际惯例兼论我国经济立法与国际惯例接轨探讨与研究.doc
- 霸州市国民经济和社会发展十二五规划.doc
- 韩城市七彩山鸡特种经济动物养殖建设项目建设实施方案.doc
- 高一政治必修一经济生活新旧教材变化.doc
- 高一上学期政治单元测试新课标人教版必修经济生活生产、劳动与经.doc
- 高三一轮复习经济生活知识归纳.docx
- 项目申报编写信息点.doc
- 建设工程质量安全管理标准化图集(安全篇2024版)ppt230页.pptx
- 《油气储存企业安全风险评估细则(2025年修订)》解读.pptx
- 2025年《危大工程专项施工方案严重缺陷清单专题培训》ppt120页_1230.pptx
- 中建分部分项检验批划分方案、资料目录策划编制要点ppt75页.pptx
- 某项目智慧工地示范项目应用成果介绍75页_5843.pptx
- 2025年中国风筝无人机LED夜光编队编程师应聘面试模拟题及答案.doc
- 2025年中国鞍钢集团招聘笔试题库附答案.doc
- 2025年中国鞍钢集团招聘面试预测题及答案.doc
- 临床器械实验培训试题及答案2025年版.docx
- 中石化《两个责任》解读分析.ppt
文档评论(0)