- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
会计电算化培训理论部分练习题及答案
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 上半会计基础试题及答案.doc
- 上半决算说明书财务情况说明书版.doc
- 上半广东会计从业资格会计专业知识考试会计基础试卷及答案.doc
- 上半四川会计从业资格考试试题及答案会计基础.doc
- 上半广东会计从业资格会计专业知识考试会计基础试卷及答案1.doc
- 上半会计从业资格考试会计基础试题及答案.doc
- 上半广东省会计从业资格会计专业知识考试会计基础试卷1.doc
- 上半会计基础试题及答案广东.doc
- 上半会计从业资格考试会计基础真题及答案.doc
- xxeas项目财务核算业务蓝图v.doc
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷最新.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷完整版.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷学生专用.docx
- 新行业解决方案-口腔行业清洗报告.pptx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷含答案.docx
- 2025年湖南高尔夫旅游职业学院单招综合素质考试题库及答案一套.docx
- 2025年湖南食品药品职业学院单招职业适应性考试必刷测试卷完美版.docx
- 2025年湖南高尔夫旅游职业学院单招综合素质考试题库参考答案.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性测试题库及参考答案1套.docx
- 2025年湖南食品药品职业学院单招职业适应性测试题库及答案一套.docx
文档评论(0)