- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
惠州市房地产市场月份市场动态
为您,我做到!
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table:
您可能关注的文档
- marketingandbdparticipantnotes市场营销与业务拓展培训手册.doc
- 上海车展凸显市场新增长点和竞争势力.doc
- 中原地区房地产市场特性分析doc.doc
- 中信现金优势货币市场基金第季度报告.doc
- 东财市场营销学在线作业一.docx
- 中国乘用车潜在消费者市场需求存区域化差异.docx
- 中国市场发展报告.doc
- 中国旅游地产市场预测与战略咨询报告.doc
- bc电子商务运营与管理课内实验报告市场营销专转本.doc
- 中国房地产市场发展分析1.doc
- 2025年童装跨境电商平台运营团队培训与推广效果提升.docx
- 药物研发效率革命:2025年AI助力靶点识别精准化策略解析.docx
- 共享自习室2025年青少年学习心理研究报告.docx
- 2025年农业产业园项目农业金融支持体系构建与风险控制分析.docx
- 2025年童装跨境电商平台运营成本控制与效益分析.docx
- 2025年文具礼品跨境电商仓储扩建项目环境影响评估报告.docx
- 2025年餐饮业品牌营销策略与市场拓展研究.docx
- 2025年餐饮行业会员营销活动策划与客户粘性增强策略报告.docx
- 工业互联网平台用户付费意愿与用户生命周期管理研究报告.docx
- 2025年氢能燃料电池船舶节能减排技术发展研究报告.docx
文档评论(0)