- 13
- 0
- 约1.08万字
- 约 68页
- 2017-05-07 发布于湖北
- 举报
Oracle_EBS_实施方法论要点
* * * * * * * * * * * * * * * * * * * * * * * Core and Optional Tasks in AIM AIM Advantage 3.0 introduces core and optional tasks Enhance AIM’s scalability Provide the flexibility to address projects from the simplest to the most complex Core and Optional Tasks Across Phases Production Transition Build Solution Design Operations Analysis Definition Optional Task BP RD BR TA MD CV DO TE PT AP PM Core Task AIM Scavenger Hunt 2 Time: 20 minutes Summary In this lesson, you should have learned the following: The six phases of AIM and their goals and objectives Key deliverables in AIM The eleve
您可能关注的文档
- OPPO吴强接受CCTV采访:5G时代,高清拍照是用户核心需求要点.docx
- 现代林业 9精要.pptx
- ORACLE-DBA教程▼要点.ppt
- oracle11g数据库常见故障处理要点.ppt
- OLED的失效分析要点.ppt
- 现代检测技术4精要.pptx
- OracleERP项目系统操作培训-财务-资产-V1.0要点.pptx
- OPPO手机市场营销浅析要点.pptx
- ORACLEEBS总概要点.ppt
- Oraclerac搭建文档要点.docx
- 中国国家标准 GB/Z 18975.11-2026工业自动化系统与集成 流程工厂(包括石油和天然气生产设施)生命周期数据集成 第11部分: 基于RDFS方法论的参考数据工业简化用法.pdf
- GB 51251-2017 建筑防烟排烟系统技术标准 正式版加条文.pdf
- 《建筑防烟排烟系统技术标准》GB51251-2017(170822报批稿)规范.pdf
- 2025年人形机器人市场研究报告.docx
- 2025年人形机器人市场研究报告.pdf
- 从对话到执行:OpenClaw企业级智能体应用手册.pdf
- 《商业模式创新》.pdf
- Openclaw龙虾全维度安全实战指南.pdf
- 2025年IT行业项目管理调查报告.pdf
- 2025年宠物洗护市场复盘总结及新品趋势.pdf
原创力文档

文档评论(0)