- 1、本文档共19页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
祝鉴合同成功的句子
祝鉴合同成功的句子
合同常用词句
合同常用词句
Warranty Period: Means (i) a period of 18 (eighteen) months following Provisional
Acceptance, during which SUBCONTRACTOR is responsible for making
good defects and damages in accordance with article 19.3;
The Service or WORK: Means all services or any portion of it to be provided by the
SUBCONTRACTOR, including without limitation all work, labour, effort,
goods, materials and equipment to be provided and/or performed by
SUBCONTRACTOR, at its own cost and expense, in strict accordance with
the functional, performance, other specification and all other terms and
conditions of this SUBCONTRACTOR.
2. SCOPE OF WORK
2.1
2.2The SUBCONTRACTOR hereby states that it has fully investigated in regard to the nature,
condition, quality, quantity, etc. of the Scope of Work to be performed.
2.3The SUBCONTRACTOR further acknowledges that it has thoroughly investigated and
satisfied itself as to all general and local condition at the SITE and its surroundings in relation to the Scope of Work within the scope of the SUBCONTRACTOR.
7. WARRANTIES AND GUARANTEES
7.1.3 that materials, equipment, tools and supplies which become a part of the Scope of Work shall
be new, of the highest quality and of sufficient size and capacity and of proper constituents to perform property for the purpose and under the operating conditions specified in the SUBCONTRACT.
10. CHANGE OF SCOPE OF WORK
The PURCHASER reserves the right from time to time by written notice to the SUBCONTRACTOR, to modify , add or to reduce the Scope of Work under this SUBCONTRACT. In case of change to the Scope of Work, then the unit price and/or SUBCONTRACT Price shall be adjusted accordingly through a Change Order process as defined on APPENDIX F, either at PURCHASER own initiative or initiated by SUBCONTRACTOR. Such modifications, additions or reductions in the Scope of Work may include any modifications of the completion date.
14. PROCUREMENT
14.1 Unless it is defined as t
您可能关注的文档
最近下载
- 非线性光学:第7章-三阶非线性光学效应之非线性光吸收(与光折射)课件.pptx VIP
- 压强和浮力中考真题精选测试含答案.docx VIP
- 消防弱电电系统施工方案.docx VIP
- T/CNESA 1001-2019_电力储能用直流动力连接器通用技术要求.pdf VIP
- 2025年事业单位招聘考试财务类综合试卷(审计知识).docx VIP
- GB_T 17241.1-2024 铸铁管法兰 第1部分:PN系列.docx VIP
- 制造业精益数字化转型解决方案(167页 PPT).pptx
- 2025年事业单位招聘考试综合类专业能力测试试卷(财务类)2025年财务会计实务案例分析试题.docx VIP
- 消防弱电电系统施工方案.docx VIP
- 2018年湖北省房屋建筑与装饰工程 消耗量定额及全费用基价表 --结构与屋面.docx VIP
文档评论(0)