网站大量收购独家精品文档,联系QQ:2885784924

DSASREPLACEMENTSTEP1CRITICALDESIGNREVIEW.ppt

  1. 1、本文档共59页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
DSASREPLACEMENTSTEP1CRITICALDESIGNREVIEW.ppt

Deirdre Jones Opening Remarks Objectives Critical Design Review for Step 1 Preliminary Design Review for entire plan Will follow up with PDR and CDR for Step 2, etc. Each Design Review will include an overview of entire plan with progress and milestones. 30-50 field sites deployed per Step 2, by Feb. 15, 2005 Schedule accelerated at direction of Corporate Board, to enhance system performance b/4 next severe weather season. Team Organization and Responsibilities Tim Hopkins (OST31) – Project Lead Chuck Piercy (OST11) – Program Management and Budget Walter Scott (OST11) – COTR Dave Holloran (NGIT) – Project Manager Leigh Dominy (NGIT) – Project Engineer Franz Zichy/Karthik Srinivasan (OST31/OPS12) – Maintenance and Logistics Mary Buckingham (OPS24) – Operational Assessment Test Director Carl McCalla/Ed Mandell (OST31) – Software Development and Integration Coordinator Chuck Piercy Program Management and Budget AWIPS System Architecture Legacy Architecture Linux Phase I Architecture Linux Phase II Target Architecture Expected WFO/RFC Hardware Architecture ~July ’05 Operational Concept Same operational concept, with enhanced computing resources additional storage space and centralized, shared mass storage using Network Attached Storage device. DS/AS Replacement Roadmap Leigh Dominy (NGIT) Overview An analysis of technology and development of a “to-be” architecture was initially briefed to the AWIPS Systems Engineering Team (SET) on 2/3/04. To-be architecture provides the framework to complete individual product improvement tasks while maintaining a common goal. X-terminals Redundant LDAD firewalls DS/AS replacement Redundant LDAD servers Serial mux upgrade Full DVB deployment To-be architecture facilitates development of a roadmap for schedule, budget and deployment planning. Roadmap assists in issue and dependency identification and resource planning for risk reduction. AWIPS To-Be Architecture Hardware Utilize Network Attached Storage (NAS) tec

文档评论(0)

tangtianxu1 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档