- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
下部结构计算书(国外英文资料)
下部结构计算书(国外英文资料)
Second, the lower structure calculation
Compile evidence
General specification of highway bridge design (JTG d60-2004)
Highway reinforced concrete and prestressed concrete bridge design specifications (JTG D62-2004)
Highway bridge foundation and foundation design specification (JTG d63-2007)
Highway masonry bridge design specification (JTG d61-2005)
Highway brick and concrete bridge design specifications (JTJ 022-85)
Highway design manual - platform and foundation
Bridge tower and basic engineering
2. The upper reaction
Pier no.
load
FZ (kN)
Pier no.
load
FZ (kN)
0
Car (largest)
1296.2715
0
The constant load
1440.590801
one
Car (largest)
1830.2055
one
The constant load
5923.682789
2
Car (largest)
1830.20538
2
The constant load
5923.682789
3
Car (largest)
1296.2715
3
The constant load
1440.590801
Support for resistance
Active support: F support = (1296.2715 + 1440) * 0.05 * 0.5 = 68.4 KN.
Fixed support: F set = 5000 times 0.1 = 500 KN;
For the safety consideration, the horizontal force of the top structure is passed to the abutment by the resistance of the supporting force.
Bridge: H = 136.8 KN;
The pier: H = 568.4 KN; (setting a fixed pedestal)
4. The abutment calculation
The platform of platform 3 is 5.5 m, and the platform of platform 0 is 3.2 m, which is controlled by bridge 3. Detailed design drawings for detailed structural dimensions.
4.1 basic information
Overall calculation parameter
Type of bridge material
C30
Bridge material weight (kN/m3)
24
Bridge volume (m3)
220.81
The abutment back (kN)
5299.39
Unit length (m)
2.75
Variable action information
Auto level
Highway grade I
Number of lanes
2
The car causes the soil pressure loading method
Vehicle load
Braking force (kN)
136.8-136.8
Dynamical effect elevation (m)
263.775 (the top of the stone)
4.2 the body check
4.2.1 cross-section
The section is 262.815 m, 5.5m from the bottom of the platform, the area of section is 14.45 m2 and the bending moment is 3.48 m4.
4.2.1.1 post-earth pressure calc
您可能关注的文档
最近下载
- 邢台市大邦水墨有限公司出口面临的结算风险及对策研究.docx VIP
- 供热管网工程施工组织设计.pdf VIP
- 2025至2030年中国自动识别技术行业市场全景调研及前景战略研判报告.docx
- 食品生产通用卫生规范考核试题及答案 .pdf VIP
- 密室逃脱项目商业计划书.docx VIP
- 【缠中说禅】教你炒股票108课完整版.docx VIP
- HJ-T 86-2002 水质 生化需氧量(bod)的测定 微生物传感器快速测定法.pdf VIP
- 【2022年】海南省海口市辅警协警笔试笔试真题(含答案).pdf VIP
- 2023年湖北交投实业发展有限公司遴选笔试真题.docx VIP
- 20S515 钢筋混凝土及砖砌排水检查井.docx VIP
文档评论(0)