大体积溷凝土质量监理实施细则(国外英文资料).docVIP

大体积溷凝土质量监理实施细则(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大体积溷凝土质量监理实施细则(国外英文资料)

大体积溷凝土质量监理实施细则(国外英文资料) The detailed rules for the quality supervision of the large concrete units of the central state branch One. Engineering overview and professional characteristics: (1) an overview of the project Chalco zhongzhou branch, the second line dressing bayer process project designed by the design institute of shenyang aluminum and magnesium, seed decomposition of 14 kinds of tank foundation, sit 756 7 on artificial dig-hole pile group on the stage, each group pile caps size (length) 31.9 m * (wide) 20.8 m * 1.8 m (high). The top elevation is -0.700 m and the base is -2.500 m. (2) professional engineering characteristics The smallest section of the group of seven sets is larger than 1m and is larger than 100M3, which is already large concrete. 2. In accordance with requirements of the mass concrete construction technology, construction organization design (scheme) explicitly take lower raw materials mixing of sand, stone, water temperature, each group of 14 root 50 mm steel pipe pile caps is set proper construction technical measures to strictly control the temperature difference value, in order to avoid temperature stress and crack. In order to effectively control the occurrence and development of harmful cracks, measures must be taken to control the hydration heat of concrete increases and the slow cooling rate, to reduce shrinkage of concrete, improve the ultimate tensile strength of concrete, should choose low hydration heat or in varieties of cement hydration heat, such as slag Portland cement. 3. According to the actual situation, this project USES the ordinary Po42.5 cement, cement by adding water reducing agent, to reduce the water cement ratio, reduce the hydration heat, to control the temperature cracks occur. 4. The project of concrete pouring can not in accordance with the general structure of cast-in-situ concrete pouring method, must develop the corresponding technical measures and construction scheme to ensure the concrete pouring and cur

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档