《水利工程施工》试卷(国外英文资料).doc

《水利工程施工》试卷(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《水利工程施工》试卷(国外英文资料)

《水利工程施工》试卷(国外英文资料) China agricultural university continues the education colleges water conservancy project Professional name performance One, the choice question (1 by 20) The distance between the inlet and the inlet and downstream weir of the diversion tunnel should be greater than (). A. m In the course of navigation, the flow velocity of the narrow bed in the section of the channel is usually not exceeded by the narrow channel. A.2m/s b. 3m/s 3. During the excavation, in the main area of blasting cutting edge design Outlines first broke through the cracks of a certain width, to buffer, reflecting the excavation blasting vibration wave, the control of its impact on the reserved rock mass destruction, to obtain a smooth excavation contour, the blasting technology for (). A. directional blasting b. pre-split blasting c. smooth blasting d. static blasting Wall dam or inclined wall dam construction, the dam surface should incline () incline to the upstream. A. 1% ~ 2% b. 3% ~ 4% ~ 5% The concrete direct entry of the automobile transport concrete allows the vehicle to travel on the concrete surface with the requirement of () above. A. 6 h The most extensive use of the rock grouting is (). A. cement grouting b. cement clay grouting c. chemical grouting The filling hole of the tunnel is usually arranged only within the center of the arch. Consolidation grouting should be arranged around the whole section according to need. The filling hole is arranged in a row of two to four meters along the tunnel axis. A. 90 ° 100 ° c. b. 120 ° d. 180 ° The duration of the extension may be extended within the time limit to reduce the construction intensity. A. key project b. non-critical project c. virtual project 9. Spray anchor bracing is after tunnel excavation, in a timely manner on the surface of surrounding rock of concrete spray layer thickness (cm), plus anchor when necessary. Steel fabric to the stability of surrounding rock. This layer of concrete is generally used as a tem

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档