- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建筑师收集计划(国外英文资料)
一级建造师网络计划(国外英文资料)
The concept and calculation of total jet lag.
Three, six time parameters and the calculation procedure
Four, the time parameter is the main calculation formula
Application of the principle of labor
Claims (contract claims and network planning)
7, common claims time.
Engineering change
9, actual construction period
The period of reward and punishment
Candidates are doing primary constructor double code network chart drawing questions, must grasp the drawing of the eight rules, such as: double code network diagram must be determined correctly express has logical relationship; In the double codename network diagram, there is no link between the nodes and the arrows. In the double codename network diagram, there is no arrow or no arrows.
???? Double code network drawing rules:
A double code network diagram must correctly express the identified logical relationship.
No loops are allowed in the double code network diagram. The so-called loop circuit is the line that starts from one of the nodes in the network diagram and follows the arrow line back to the original starting line.
In a double codename network diagram, there cannot be a two-way arrow or no arrows between nodes.
In the double codename network diagram, there is no arrow or no arrow at the end of the arrow.
5, when some nodes of double code network diagram of multiple arrows line or more introverted outgoing line, in order to make the graphics is concise, can use method of bus bar drawing (but should satisfy a job with an arrow line and the corresponding pair of nodes).
When drawing a network diagram, the arrow line should not cross. When the crossing is unavoidable, the bridge method or the point method is available.
7, the double code network diagram should be only a start node and a destination node (with the exception of multiobjective network planning), and all the other nodes are should be the intermediate nodes.
The double codename network diagram should be organized and reasonable.
??
您可能关注的文档
- 600 MW超临界锅炉低NOx轴向旋流熄灭器(国外英文资料).doc
- 2011年10月自考《心理心思学》必背常识6(国外英文资料).doc
- 《水工修建物》1(谜底)(国外英文资料).doc
- “汉十六字砖”的书法价值(国外英文资料).doc
- 你疯了,脑袋进水了,用英语如何说?(国外英文资料).doc
- 一条网线接两台电脑2(国外英文资料).doc
- 什么是承载式车身和非承载式车身(国外英文资料).doc
- 供水管道标准(国外英文资料).doc
- 修建施工技巧自测试题3(国外英文资料).doc
- 健步行走有十二种惊人疗效(国外英文资料).doc
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷最新.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷完整版.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷学生专用.docx
- 新行业解决方案-口腔行业清洗报告.pptx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性考试必刷测试卷含答案.docx
- 2025年湖南高尔夫旅游职业学院单招综合素质考试题库及答案一套.docx
- 2025年湖南食品药品职业学院单招职业适应性考试必刷测试卷完美版.docx
- 2025年湖南高尔夫旅游职业学院单招综合素质考试题库参考答案.docx
- 2025年湖南高尔夫旅游职业学院单招职业倾向性测试题库及参考答案1套.docx
- 2025年湖南食品药品职业学院单招职业适应性测试题库及答案一套.docx
文档评论(0)