- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
一级建筑测验工程项目治理温习领导(国外英文资料)
一级建造考试工程项目管理复习指导(国外英文资料)
In 2012, project management was a third increment
The project is designed to increase the value of the project.
The main meaning of construction project general contracting is not that total responsibility and turnkey, its core is through the integration of design and construction organization, promote the tightness combination of design and construction of, to achieve the purpose of value for project construction, most use change price contract.
The purpose of information management is to provide value-added services for project construction through the organization and control of effective project information transmission.
Three platforms
Project management planning is a programmatic document guiding the project management
Quality manual is a programmatic document of enterprise quality management system.
The design of the construction organization is a programmatic document that directly instructs the technical activities and management of the on-site construction operation.
Nine ways
The dynamic settlement of the price of the project: the method of settling the price according to the actual price; To calculate the price difference according to the main material; The method of price adjustment for completion; The method of adjustment formula (dynamic settlement formula); The regulation of price adjustments caused by price fluctuations in standard construction bidding documents.
Construction cost control: the expression method of deviation analysis (cross channel diagram, table method, curve method)
The basic method of construction cost analysis: comparative method, ratio method, factor analysis method, differential calculation method.
The ratio method is divided into the relative ratio law (the output value), the dynamic ratio method (the base period index and the sequential index), and the formation ratio method.
Engineering quality statistical method: stratification, factor analysis, permutation and histogram.
L hazard identification me
您可能关注的文档
- 600 MW超临界锅炉低NOx轴向旋流熄灭器(国外英文资料).doc
- 2011年10月自考《心理心思学》必背常识6(国外英文资料).doc
- 《水工修建物》1(谜底)(国外英文资料).doc
- “汉十六字砖”的书法价值(国外英文资料).doc
- 你疯了,脑袋进水了,用英语如何说?(国外英文资料).doc
- 一条网线接两台电脑2(国外英文资料).doc
- 什么是承载式车身和非承载式车身(国外英文资料).doc
- 供水管道标准(国外英文资料).doc
- 修建施工技巧自测试题3(国外英文资料).doc
- 健步行走有十二种惊人疗效(国外英文资料).doc
- 一级注册结构工程师测验科目及纲目(国外英文资料).doc
- 一年级语文下册 灯塔爷爷的同伙2教案 冀教版(国外英文资料).doc
- 一级结构纲目(国外英文资料).doc
- 一线进口品牌黑色多普勒参数(国外英文资料).doc
- 一结构考纲及标准(国外英文资料).doc
- 【资本】碳青霉烯类抗生素的临床应用沾染性与沾染性疾病评论辩论版(国外英文资料).doc
- 一维定长悬索题目标无限元法求解①(国外英文资料).doc
- 一级建筑师《项目治理》第二章第三节演习题(国外英文资料).doc
- 一道秀丽的弧线划过面前(国外英文资料).doc
- 一钢轧厂临盆TC420L、T420L 汽车大梁用热轧钢带工艺操纵规程(国外英文资料).doc
文档评论(0)