- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
厂区土方回填施工(国外英文资料)
厂区土方回填施工(国外英文资料)
The application form for the return of the land reclamation works in the factory district
The name of the project: the factory of foxconn, the factory of foxconn
To: the construction supervision co., LTD. (supervising unit)
We have already finished according to the relevant provisions of the construction contract foxconn (Hui County) training factory factory earthwork backfill engineering construction plan, and approved by the responsible person of my unit the superior technology review, please review.
The attached:
Backfill construction plan for the local area of the factory
Contracting unit (chapter) :
Project manager:
Date:
Expert supervision engineer review opinion:
Supervisory engineer:
Date:
General supervision engineer review opinion:
Project supervision organization:
General supervision engineer: date:
Foxconn, the factory that works at foxconn
Backfill construction plan for the local area of the factory
Henan construction international engineering co., LTD
In March 2012,
Land reclamation construction plan
First, the general situation of the project
In the first phase of the workshop of the foxconn, the workshop of my project, foxconn, the site of the workshop of the factory is the backfilling and backfilling of the factory area and the backfilling of the green belt.
Personnel, mechanical configuration
staffing
One person in charge: kong linhong
Construction captain two: hu chuhua Chen 4 Lin
Technician one: yan zhongpeng
Measurement engineer: jia yujiang
Full-time security officer: zhang zhengyan
Mechanical equipment
Three loading machines for three machines
A roller mill for the grey earth mixer
Full station 1 water level 2
The bulldozer 2 sets
Third, construction plan
The project is scheduled to start on March 1, complete on March 10, and the construction period is 10 days.
Construction of 1 #, 2 #, 3 # and 5 # workshop in the south area first, the total of 305,81m3 will be completed in 6 days. After the backfilling of the soil in the wor
您可能关注的文档
最近下载
- 电工技能鉴定实操题库(高级工).pdf
- GB/T38058-2024民用多旋翼无人机系统试验方法.pptx VIP
- 公园绿化养护管理制度 .pdf VIP
- 2025甘肃甘南州专业化管理的村党组织书记招聘45人笔试备考试题有答案详解.docx VIP
- 2023-2024学年重庆市凤鸣山中学数学七年级第一学期期末经典试题含解析.doc VIP
- 最新公务员面试试题经典题及答案.docx VIP
- 长恨歌意象研讨分析.pdf VIP
- 2025甘肃张掖市专业化管理村党组织书记招聘32人备考试题及答案解析.docx VIP
- 江西省临川第一中学2024-2025学年高一上学期开学考试数学试题(解析版).docx VIP
- QSR质量手册(超详模板).doc VIP
文档评论(0)