客专路基边坡人字骨架施工及挡水缘一次成型工艺总结(国外英文资料).docVIP

客专路基边坡人字骨架施工及挡水缘一次成型工艺总结(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
客专路基边坡人字骨架施工及挡水缘一次成型工艺总结(国外英文资料)

客专路基边坡人字骨架施工及挡水缘一次成型工艺总结(国外英文资料) Yunnan segment of the shanghai-kun railway passenger line The construction of the side slope of the roadbed and the forming process report of the water baffle China railway 16th bureau group The shanghai-kunming special yunnan segment station is the TJ3 standard 6 October 30, 2002 The construction of the skeleton and the retaining water Report on molding process 1. The project summary The length of this section is DK1120 + 185.85 ~ DK1120 + 392.45, which is 206.6 meters, which is located between CAI jia village 2 # and CAI jia village 3 # bridge, the design basis bed is the road of the rift road embankment. Some of them had been excavated 16, 000 square and dug 14, 000 square and filled in 8, 000 square. The protection project is DK1120 + 220 ~ DK1120 + 365 on the left side, 145m long, and set up the gravity type road to the wall of the wall of the wall with C45 concrete. The right and left side of the roadbed are protected by a hydraulic spray plant, and the two sides are protected by a cross-section of the skeleton protection. At present, the protective engineering is basically completed, the roadbed project is ready to fill in the test section, and the preparation work is being planned. The roadbed project adopts mechanical construction, and the ground floor is set aside 30cm for the foundation of the foundation, and the surface is basically flat. Reduced construction the small steel pouring concrete construction, herringbone cutoff skeleton water retaining a molding pouring bunds, keeping in good health using geotextile coverage sprinkler maintenance. The dimension and strength of the shield protection engineering meets the requirements of the design document, the line straightening. Basic situation 2. This cut slope with herringbone cutoff skeleton slope protection protection, backbone net from 5 m, a net frame from 3 m, in-situ, the model adopts C30 concrete skeleton adopts hydraulic spray and sow grass planting shrubs protect

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档