- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
工程完工验收后施工、监理企业项目治理人员解锁(含交易中间解锁)、原件核退干事指南(国外英文资料)
工程竣工验收后施工、监理企业项目管理人员解锁(含交易中心解锁)、原件核退办事指南(国外英文资料)
After the completion of the project, the construction, supervision enterprise project management staff unlocks (including the transaction center unlocking), the original nuclear refund business guide
?
1. The item name
After the completion of the project, the project management staff of the project shall be unlocked and the original nuclear refunded
? Certificates and valid period of validity
Certificates issued: return to the builders registration certificate (project managers license), the construction teacher and the full-time security officers safety production evaluation certificate, the directors registration certificate
Certificate of validity:
? The type of approval and the validity of the law
Daily management
? 4. Set the basis for
?
? Conditions for examination and approval of 5.
?
? 6. Application materials
Description: after the completion of the project, the project management personnel of the project, the project manager of the project, and the original core can be processed together, the same information is not to be submitted again.
2, in the municipal construction engineering trading center the bidding project, please notify the window at the same time to deal with the city trading center won the bid, head of the construction enterprise of the winning project to unlock (trading center has locking) and project management, construction, and supervision of unlock (completion acceptance) two accepts the items.
First, construction, supervision enterprise project manager unlocked:
(1) the submission of the winning bid: the photocopy of the letter of acceptance;
- 2, jun expressway engineering acceptance materials, concrete is to point to: the completion acceptance report or commissioning report, or issued by the municipal construction engineering safety surveillance construction engineering construction safety assessment book;
Note: copy the original copy; For part of the construction has been completed, s
您可能关注的文档
最近下载
- 河南省建设工程安全生产标准化图集.docx VIP
- 别克英朗GT说明书.docx VIP
- 洪水计算(推理公式法).xls VIP
- 初中音乐 西南师大课标版 七年级上册 走进歌乐山 《走进歌乐山》 课件.ppt VIP
- (高清版)DBJ∕T 13-278-2025 《福建省电动汽车充电基础设施建设技术标准》.pdf VIP
- 带式输送机头尾部基础荷载计算书.xls VIP
- 建筑《工程质量》首件验收制度.docx VIP
- (高清版)DB21∕T 4071-2024 沥青路面再生集料应用技术规程.pdf VIP
- 中国冰沙机行业市场现状分析及竞争格局与投资发展研究报告2024-2029版.docx
- Word操作培训ppt课件.pptx VIP
文档评论(0)