新华管帐网 企业产品成本核算轨制.谜底doc(国外英文资料).docVIP

新华管帐网 企业产品成本核算轨制.谜底doc(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
新华管帐网 企业产品成本核算轨制.谜底doc(国外英文资料)

新华会计网 企业产品成本核算制度.答案doc(国外英文资料) Enterprise product cost accounting system One, the single item choice (10 item in this kind of problem, each item 4 points, a total of 40 points. Single choice (each item in the blanks, only one conforms to the correct answer to the question, please select the correct option Product cost calculation for small batches or single products is (B). A. the taxonomy Partial method B. C. Step by step D. parallel to the step method A company USES the advanced first out method to calculate the cost of the material. The actual cost per ton is 500 yuan per ton. On the 6th and 18th of the month respectively, purchase and enter the materials 500 The actual cost per ton is 480 yuan and 520 yuan respectively. The month lO day and the 28th send out A material of 300 tons and 400 tons respectively. The actual cost of sending A material on the 28th day of the month is (A) yuan. A. 148, 000 B., 150, 000 C. 148, 800 D. 192, 800 The enterprise has the auxiliary production workshop of a and b, which assigns the auxiliary production cost according to the interactive distribution method. In September, the production cost of the factory was 128,900 yuan. The workshop will be assigned to the b workshop when the interaction is allocated The cost of production is 8100 yuan, and the production cost of the second workshop is 9,000 yuan. In the same month, the unit of the nail shop shall allocate the auxiliary production cost () yuan to the benefit unit other than the auxiliary production. 128000 A. 128900 B. 129800 C. D. 137900 A B is wrong An enterprise USES a weighted average of the end of the month to calculate the cost of raw materials. On June 1, 2013, the actual cost of the material was 300 kg, and the actual cost per kilogram was 108 yuan. On the 10th of the month, 700 males were purchased The actual cost per kilogram is 120 yuan per kilogram; On the 20th, the material is 500kg. On June 30, the balance of the material was (C) yuan. 57, 600 A. 60 of 200 B. 58

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档