- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水系生态驳岸处理方法(国外英文资料)
水系生态驳岸处理方法(国外英文资料)
One, the construction of the stake?
???? Pile revetment before construction, should be to deal with a stake, such as: according to the size of design drawings shown on one end of the pile cutting into pointed cone, easy to into the Banks of the river mud; The length of the pile is calculated by the elevation of the bank and the elevation of the horizontal plane. ?
???? Before piling into the soil, it also had to repair the edges of the original riverbank, dig some dirt, and fix the mud on the riverbank to make it easier to break in. If it is relatively loose on the edge of the original riverbank, it may collapse, and proper reinforcement should be done. ?
???? Second, the construction of the fake wooden posts?
???? The imitation of a wooden pile is similar to the construction method of the wooden pile, and it can be built up like a bank. Before the construction of the wooden pile, the prefabricated pile of reinforced concrete is prefabricated, and the length is determined according to the elevation of the river bank and the elevation of the bottom of the river. The diameter of 1 ~ 2m is 15 ~ 20cm in diameter, the head is pointed, and the concrete strength of the small cylinder is 100 percent. Rows of the reoccupy after complete or all white cement admixture amount of pigment powder, can be iron oxide red, iron oxide yellow pigment powder, etc., allocate the color of the bark, used tools color cement mortar, adopting a powder, scraping, pull a light decoration on the cylinder, the cylinder imitation into a stake. ?
???? The construction of the turf?
???? River bank slope should be within the natural rest Angle, slope will not collapse, the river can also do river slope, flatter to the soil on the slope of the river, or paving layer is easy to make greening plant survival of nutritional soil, and then construct turf. ?
???? If the riverbank is steeper, it can be put on a grassy slope when the grass is paved, and the grass will not fall. After a per
您可能关注的文档
- 止水钢板施工巧节(经典)(国外英文资料).doc
- 正宗米线是寻求低脂瘦身人群的首选(国外英文资料).doc
- 正常应用极限状态计算(国外英文资料).doc
- 正式)内、外力感化及地表形状学案(国外英文资料).doc
- 正弦线、余弦线、正切线教授教化设计(国外英文资料).doc
- 止水带装置技巧交底(国外英文资料).doc
- 止水铜片焊接工艺试验计划(国外英文资料).doc
- 正星加油机通俗弊病揣摸剖析(国外英文资料).doc
- 正线跨帆海路连续梁支座装置技巧交底签证表(国外英文资料).doc
- 正线声樊篱施工技巧交底(国外英文资料).doc
- 求职英语口试:Expected Salary 薪金希冀篇(国外英文资料).doc
- 求职文档(国外英文资料).doc
- 永久的灯塔_意味主义在_到灯塔往_中的应用(国外英文资料).doc
- 汇川变频器在风机水泵类负载上的调试经历(国外英文资料).doc
- 汇集图绘制规矩及方法(国外英文资料).doc
- 江苏省室庐设计标准(国外英文资料).doc
- 汇通膜(国外英文资料).doc
- 江苏省南京市高淳区2015届中考一模数学试题(含谜底)(国外英文资料).doc
- 江苏省培植工程质量检查员岗亭培训参考资料测验电子小抄第七章 地下防水工程(国外英文资料).doc
- 汉子拥有安康的特色,能在28分钟内步行3公里(国外英文资料).doc
文档评论(0)