- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
浅析电力电缆施工及运转中受潮进水的主要启事及处理办法(国外英文资料)
浅析电力电缆施工及运行中受潮进水的主要原因及解决办法(国外英文资料)
The main causes and solutions of the flood water in the construction and operation of shallow power cables
[author: wg308308 | : my original | number: 470 | update time: 2009-3-28 | : wg308308]
According to the overall planning, municipal construction in recent years in my company to undertake the construction of city network reconstruction, the high voltage cable has been gradually instead of overhead lines has been widely used. At present our company construction power cable is mainly used to YJLV22 series crosslinking aluminium core cable and YJV22 series crosslinking copper core cable (10 kv) is given priority to, compared with the overhead line and old oil filled cable, the cable insulation performance is good, allowing high working temperature (90 ℃), has good mechanical strength. The large application of cables, which both improve the reliability of the power supply and beautify the city, is worth promoting. But in the process of construction for a long time, a lot of feedback of running unit, we found that the cable be affected with damp be affected with damp this phenomenon more and more become the water potential hazards affecting the safe operation of the cable.
The cause and harm of the flood in the cable
(1) the orientation of the whole plate of cables in the factory, the two ends are sealed with plastic cover seal, but in the construction site according to the actual situation to go after a while, the remaining parts of the wound with a simple plastic fracture, because open at ordinary times put and sealing is not good, day a long, hard to avoid can have water vapor infiltration cable.
(2) the cable laying, often need to cross the road, bridge and culvert, etc., due to weather or other reasons, in cable trench, also often have accumulated a lot of water in the installation process, inevitably there will be a cable head submerged in water, because of the plastic wrap is lax or damaged and make the water into the cable
您可能关注的文档
- 水利工程施工治理主要义务和方法(国外英文资料).doc
- 水利水电学院水工结构工程博士造就计划(国外英文资料).doc
- 水利水电关键工程外观质量检测标准(国外英文资料).doc
- 水利水电勘测设计技巧文件范本目录(国外英文资料).doc
- 水利水电工程修建物-泄水修建物测验题(国外英文资料).doc
- 水利水电工程施工总承包企业天资等级标准(国外英文资料).doc
- 水利计划(国外英文资料).doc
- 水利水电施工组织设计义务书领导书一(国外英文资料).doc
- 水利水电工程施工总承包新天资(国外英文资料).doc
- 水利水电工程施工总承包三级升二级天资标准中所需要的人员数量(国外英文资料).doc
- 难点解析-人教版(五四制)6年级数学下册《有理数》专项测评试题(含详解).docx
- 难点解析-人教版(五四制)6年级数学下册《有理数》专项测评练习题(解析版).docx
- 2025年XR虚拟合成师(县级XR演播室)招聘面试题库附答案.doc
- 难点解析-人教版(五四制)6年级数学下册《有理数》专项测评试卷.docx
- 难点解析-人教版(五四制)6年级数学下册《有理数》专项攻克试卷(含答案详解).docx
- 2025年XR虚拟导播师(县级XR演播室)招聘笔试专项练习含答案.doc
- 难点解析-人教版(五四制)6年级数学下册《有理数》专项测评试卷(含答案解析).docx
- 难点解析-人教版(五四制)6年级数学下册《有理数》专项攻克试题(含答案及解析).docx
- 难点解析-人教版(五四制)6年级数学下册《几何图形初步》难点解析试题(详解).docx
- 难点解析-人教版(五四制)6年级数学下册《几何图形初步》定向测试练习题(含答案解析).docx
文档评论(0)