- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
液压式尾管吊挂器应用仿单(国外英文资料)
液压式尾管悬挂器使用说明书(国外英文资料)
CYGJ
Hydraulic Liner Hanger Instructions
Hydraulic stern tube hanger
book
Sichuan oil bureaus underground operation
Downhole Operation Department
Of Sichuan Petroleum Administration
order
In the preface......... one
The basic structure and principle of action... 2
The basic parameters and the applicable conditions......... 3
3, the underground condition of the hydraulic tailpipe hanger... 4
The ground checks...... 4
Step 5............... 5
As a matter of fact......... 8
The tail pipe is the answer... 8
preface
Thank you for using our products for more satisfactory use. Please read the instructions carefully before using.
USES:
The tailpipe hanger is mainly used for the tail pipe suspension through hydraulic transmission, and is widely used in the technology tailpipe and the production tailpipe cementing of oil and gas well, brine well and geothermal well. The following situations can be used in the tailpipe hanger:
A large number of casing and cost savings are possible for exploration Wells and evaluation Wells.
2, in the case of reducing casing head and surface casing load, completion of the well;
Improve long period cementing operation to prevent low voltage leakage.
4, quick and quick sealing of open holes and old Wells to reinforce the well;
Provide flexible completion mode and safer cementing operation;
Strengthening the strength of the rock salt section in the back and stern of the rock salt well;
7, sealing the damaged section of the upper casing (corrosion, broken, etc.).
one
First, basic structure and function principle
Figure 1 XG series stern tube hanger structure schematic
The basic structure of the hydraulic stern tube hanger is shown in figure 1. It is carried by the loading tool + hanger + casing plug short section + casing string + touch assembly a few large parts, the attachment has the holding ball, the drilling liver glue plug and the ball field.
Principle: to sit under the liner hanger connection string hanging position, fr
文档评论(0)