- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
管道试压与冲洗计划(国外英文资料)
管道试压与冲洗方案(国外英文资料)
The main duties and responsibilities
one
On-site command
one
suk
Coordination and command
2
Technical director
one
Long Bin
Technical guidance
3
Comprehensive coordination
one
FuZhong huan
coordinate
4
Director of security
one
Xu Liang
Safety monitoring
5
Pressure testing personnel
4
Pressure testing, flushing,
Safety measures and contingency plans
5.1 security measures
The warning zone shall be set in the time of the trial pressure and the warning signs shall be set. No one shall be allowed to enter the scene.
5.1.2 before pressure testing must be conducted for homework personnel technical clarificaiton and safety technical disclosure, make clear tasks and technical requirements, the operator do have a clear division of responsibilities, organized, and education workers strictly implement safety operation procedures.
All construction personnel entering site construction must wear safety helmet and seat belts on high places, and safety nets should be set when necessary.
The construction site must set up a full-time security officer, and the class must have a part-time security officer who will resolutely correct the violations and avoid the occurrence of injuries and injuries.
The scaffold built for construction must be strong, reliable and acceptable for use after acceptance.
Before the test pressure of 5.1.6 pipe, it is necessary to check the fastness of the pipe bracket and the fastness of the pipe blocking plate, and the test pressure can be carried out before the problem is confirmed.
The 5.1.7 water pressure test should be carefully checked to record the swelling and welding of the abnormal phenomena.
5.1.8 forbidden at the end of the pipe (such as: wall board, plug, etc.) standing opposite person, in case of running water cuts, when test pressure is not allowed to tighten bolts or lock nut.
5.1.9 when the pipe is pressurized, the pressure only slowly rises to prevent accidents. The test pressure must be in accordance with the rules of desig
文档评论(0)