- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
地下水防护办法(国外英文资料)
地下水防护措施(国外英文资料)
Groundwater protection measures
To prevent materials, waste, etc. Run, run, drip, leakage and seepage of groundwater pollution, special protective measures: take the following groundwater for three prevention engineering points, key, in general, the seepage control section respectively, specific as follows: (1) key impervious area focus on impervious area including galvanizing workshop, blue workshop, staging of hazardous waste, waste water treatment and accident pool area. The foundation must be made of clay, and the thickness must not be less than 100cm. The permeability coefficient of clay materials 10-7 cm/SEC or less, in can meet 100 cm thick clay foundation pad, under the condition of common clay cushion can use 30 cm thick, and placing the 2 mm thick, high density polyethylene or other artificial anti-seepage material at least 2 mm thick, the permeability coefficient of 10 or less - 10 cm/SEC. Key impervious area except for floor foundation seepage control measures taken by the further take the following measures: s hazardous waste collection pool between staging and accident using anti-seepage concrete + HDPE membrane (1.5 mm thick, coefficient of permeability is not higher than 1.0 x 10-11 cm/s of HDPE membrane as the impervious layer);
(2) general seepage zone Generally impervious area including seepage core zone of the remaining parts of the ground, including raw material storage, shipping department, the permeability grade level is not lower than P1 impermeable concrete (permeability coefficient is about 0.4 x 10-7 cm/s, the thickness of not less than 20 cm) hardening the ground.
The non-seepage area includes the green area of the factory, the office building, the canteen, etc., not taking the anti-infiltration measures.
In addition, the following measures should be taken:
(1) to implement detailed plans for clean production and recycling of all kinds of wastes, and reduce the amount of pollutants discharged; To prevent leakage of pollut
您可能关注的文档
最近下载
- 津津有味·读经典Level3《弗兰肯斯坦》译文.docx
- Zippo2008原版年册完整集合DE系列.pdf VIP
- 2025年体育产业数字化转型与体育赛事数据安全与隐私保护报告.docx
- 纪委监委考试题及答案.doc VIP
- 基于“劳动育人”理念的家校共育小学生劳动素养的实践研究.docx VIP
- 2025年价格鉴证师考试题库(附答案和详细解析)(1010).docx VIP
- 相声艺术讲座——基本结构.pdf VIP
- 雨课堂学堂在线《生心理健康教育(广州中医药)》学堂云单元测试考核答案.pdf
- 黄金分割(北师大版)市公开课一等奖省赛课获奖PPT课件.pptx VIP
- 运输服务优化方案.pdf VIP
原创力文档


文档评论(0)