改良A_2_O工艺在长春北郊污水厂的应用.pdfVIP

  • 3
  • 0
  • 约8.16千字
  • 约 3页
  • 2017-05-30 发布于河南
  • 举报

改良A_2_O工艺在长春北郊污水厂的应用.pdf

改良A_2_O工艺在长春北郊污水厂的应用

2 105 :A O 2 A O 1 1 2 ,   ,   (1. ,    150090; 2 ,   130001) 2   【 】  A O , , 。 COD433mg L , COD58.8mg L, COD86.3%, BOD 91.8%, 5 NH -N88.5%, TP81.1%, GB18918-2002B。 3 2 【】 A O;;; 【】 TU992.3    【】 B     【】 1001-6864(2010)03-0105-03 2 APPLICATION OF MODIFIED A O PROCESS OF CHANGCHUN BEIJIAO WASTEWATER TREATMENT PLANT 1 1 2 HAOYi-peng , DUYan-wu , ang Huan-qi (TheArchitectural Design and Research Institute, Harbin Institute of Technology, Harbin 150090, China;2Changchun aterGroup, Changchun 130001, China) 2   Abstract:ModifiedA Oprocessshowed stable performance, goodability of resisting shock loading and superior waterquality to designed standards. henthe COD concentration of the influentwas433mg L, the CODof the influentwas 58.8mg L.The COD removal rate of the system was 86.3%, BOD5 of 91.8%, NH -Nof 88.5%, andTP of 81.1%.All of them couldreach the I-Bcriteria specified in dischargestandard 3 of Pollutantsfor municipal astewater treatment plant (GB18918-2002). 2 Key wor s:modifiedA O process;phosphorusremoval;nitrification;activated sludge 2   , GB18918- A O , 2 2002《》 A O, ,

文档评论(0)

1亿VIP精品文档

相关文档