乌江源风电场2014年8月电网故障情况分析报告剖析
乌江源风电场2014年8月电网故障情况分析报告
编写人:詹 彪
审核人:彭永春
2014年8月
目 录
一、 乌江源风电场本场故障情况·······································3
1、8月10日重合闸启动分析········································3
1)故障发生的原因···············································3
2)故障影响情况·················································3
3)故障发生后采取的措施·········································4
2、8月11日远切乌江源故障分析····································4
1)故障发生的原因···············································4
2)故障影响情况·················································5
3)故障发生后采取的措施·········································5
3、8月12日机组故障脱网分析·····································6
1)故障发生的原因···············································6
2)故障影响情况·················································6
3)故障发生后采取的措施·········································7
4、8月12日乌威线失电故障分析···································7
1)故障发生的原因···············································8
2)故障影响情况·················································9
3)故障发生后采取的措施·········································10
二、 威宁地区其它风场因电网故障受损情况····························10
1、乌江源风电场与龙源风电场故障情况分析··························10
2、乌江源风电场与龙源风电场因电网故障受损情况比较················11
三、乌江源风电场今后采取的整体措施································13
1、加强与调度机构的沟通··········································13
2、提升机组安全稳定运行性········································13
3、加强运行人员培训管理工作······································14
4、加强升压站设备治理及隐患排查工作······························14
5、加强与周边风电场的联系········································14
一、乌江源风电场本场故障情况
乌江源风电场2014年8月10日至12日共受电网故障影响4次,其分别为乌威线A相瞬时性接地跳闸引起乌江源线路保护装置重合闸动作一次;水威线故障远切乌江源风电场1号主变、2号主变一次;六盘水电网野水线(野马寨电厂至六盘水电网220kV线路)A相接地故障引起电网波动一次;六盘水电网野水线故障导致黄水(黄家山变电站至滥坝变电站线路)线超负荷并由威宁变断开乌威线201开关一次。四次故障具体情况如下:
1、8月10日重合闸启动分析
表1、 乌江源风电场8月10日重合闸动作情况统计表
乌江源风电场2014年8月10日重合闸动作情况统计表 故障发生时间 故障结束时间 故障持续时间(小时) 故障损失电量(万千瓦时) 备注 8月10日19时23分 8月10日 19时23分 0 0
1)、故障发生的原因
2014年8月10日19时23分,乌江源风电场区域受强雷暴天气影响,在乌威线5.4kM处发生A相瞬时性接地故障,引起A相单跳并重合闸成功,此次未造成机组